
Challenge: Reliable Landfill, operational since 1996, began receiving persistent odor complaints in late 2016, specifically related to high levels of...

Challenge: The Durham York Energy Centre (DYEC), a waste-to-energy facility managed by Covanta, processes 140,000 tonnes of residential garbage annually....

Challenge: The Wichita collection system, consisting of lift stations, forcemain, and gravity sewers, faced several challenges: Persistent odors in the...

Challenge: The Wallaceburg WPCP, a conventional activated sludge plant, was experiencing operational upsets due to overloading. These issues included: Frequent...

Challenge: The plant faced odor complaints, sludge buildup, and regulatory violations due to overloaded systems and poor aeration. Solution: SciCorp...

Challenge: The New Horizon Wastewater Treatment Plant (WWTP) faced multiple issues due to operational conditions that differed from the initial...

Challenge: A new wastewater treatment plant designed to handle 18,300 liters/day faced operational issues due to the lower-than-expected actual flow...

Challenge: A 60 MGD wastewater treatment plant in North Carolina faced significant operational issues, including excessive sludge production, frequent plant...

Challenge: A large wastewater treatment plant in Detroit was facing severe odor issues due to high levels of hydrogen sulfide...

Challenge: Both wastewater treatment plants (WWTPs) faced significant odor issues from biosolids, with complaints from neighbors and the local landfill...

Challenge: The Parmalat Winchester WWTP faced odor complaints, ineffective odor mitigation methods, and plant upsets due to increased dairy production....

Challenge: Oregon Cherry Growers, a large cherry farm in Oregon’s Willamette Valley, faced critical issues with their wastewater treatment system...